Website projects have a reputation for running late and over budget, and most of the reasons have nothing to do with code. The scope keeps growing because nobody agreed which pages the new site needs. Design waits for content, content waits for the people who know the subject, and developers build templates for pages that change at the last review. Launch day arrives with half the redirects missing, and a month later organic traffic has dropped and nobody knows why.

This guide covers how to manage a website project from the marketing side: what kind of project it is, how to set the budget and expectations, the process from discovery to the weeks after launch, getting content done on time, protecting search traffic through redirects and checks, sign-offs, which steps to skip at your team size, what to track, and templates you can copy. It's the detailed version of the website section in our guide to marketing project management. Nothing here depends on a particular tool or website platform.

Topic Section
What you're taking on The nature of a website project · Where project management comes in · Kinds of website project
Before you start Budget · Expectations
How it runs 1. Discovery · 2. Scope and sitemap · 3. Content · 4. Wireframes · 5. Design · 6. Build · 7. Content entry · 8. SEO, redirects and tracking · 9. QA · 10. Sign-off · 11. Launch · 12. After launch · Landing pages as an ongoing program
Your team Scale it to your team size · Roles and sign-offs
Running it Set it up as work · What to track · Cadence · Handoffs
Copy these Templates
Other situations Managing website projects for clients · Where it goes wrong · Tools

The nature of a website project

It's delivery work with a goal attached. Up to launch, the project is judged on scope, date, budget and quality. After launch, it's judged on whether the site does its job better than the old one: more enquiries, sign-ups or sales, and at least as much search traffic.

It touches everyone. Every team has pages on the website, and every team has opinions about it. Sales, product, leadership, support, HR and legal all become reviewers. Without clear decision rights, the project turns into a negotiation.

Content is the critical path. Design and development are usually planned carefully. Content (writing, gathering, approving and entering it) is often left to "whoever owns that page" and becomes the reason launch slips.

There's real risk at launch. Changing URLs, page structure or the platform can cost search traffic if redirects, metadata and tracking aren't handled. Google's own guidance on site moves says a site can see temporary fluctuations in search while it processes the changes. A well-run project plans for this; a badly run one discovers it a month later.

Where project management comes in

A website project is classic project management: a defined scope, phases that depend on each other, many contributors, outside partners, and a launch date. The habits that make it work:

  • Agree the scope as a page list early, and manage changes to it formally.
  • Treat content as a workstream with owners, dates and reviews, not as something that will arrive.
  • One decision-maker, plus named approvers per page type, so reviews don't become committees.
  • A plan built backwards from launch, with milestones for content, design, build, QA and sign-off.
  • A launch checklist and a post-launch plan, including redirects, tracking and monitoring.

Kinds of website project

Kind What changes Main risk
Redesign (same platform, same URLs) Look, layout, some content Scope creep; content not ready
Rebuild (new platform) Templates, CMS, often URLs Redirects, tracking and forms breaking
Migration (domain or platform move) URLs or domain Search traffic loss if not planned
New site or section Everything, from scratch Scope and content
Landing pages (ongoing) Individual pages for campaigns Speed of turnaround; tracking

Most of the process below applies to all of them. Landing pages, which are ongoing rather than one-off, have their own short process at the end.

Budget

Website budgets are often set as a single number for "the agency". The real cost has more parts:

  1. Design and development: agency, freelancers or in-house time.
  2. Content: writing, editing, photography, video, illustrations, and the time of the people who know the subject.
  3. Platform and hosting: CMS licences, hosting, plugins, third-party tools and integrations.
  4. SEO and migration: audit, redirect map, checks before and after launch.
  5. QA and accessibility: testing across devices and browsers, accessibility checks.
  6. Project management and internal time: reviews, decisions and coordination.
  7. Contingency: for the things that always come up (a common habit is a reserve of a tenth or more).
  8. After launch: maintenance, updates and the fix list in the first weeks.

Three decisions to write down before you start:

  • The fixed parts and the flexible parts. Usually the launch date and budget are fixed and the scope flexes, or the other way round. Decide which, because you can't fix all three.
  • How scope changes are handled: who can approve them, and how their cost and time are estimated.
  • Who pays for what after launch: maintenance, hosting, fixes, future pages.

Expectations

  • What the new site is for. Pick the outcomes that matter: more enquiries or sign-ups, better conversion on key pages, easier updates for the team, a clearer brand, faster pages. These become the measures after launch.
  • A baseline. Record current traffic, conversions, top pages and search performance before you change anything, so you can compare afterwards.
  • A realistic timeline. Content and reviews usually take longer than design and build. Plan them first.
  • What can happen to search traffic. Explain that URL or platform changes can cause temporary fluctuations, and that the redirect and SEO work is there to keep them small and short.
  • What a website can't fix: an unclear offer, a product that doesn't fit, or no one to keep the content up to date.

Write the budget and expectations into the website brief (there's a template below) and get it agreed by the project owner.

1. Discovery

What happens: understand the current site and what the new one must do. Analytics (top pages, conversions, traffic sources), search performance, a content inventory, stakeholder interviews, user feedback, and a look at competitors.

Output: a website brief: goals, audiences, what to keep and fix, measures of success, constraints. Gate: the project owner approves the brief.

2. Scope and sitemap

What happens: decide which pages the new site will have. Start from the content inventory: for every existing page, keep, merge, rewrite or remove. Add new pages. Group them into page types (home, product, solution, pricing, article, case study, landing page, legal) because each type becomes a template.

Output: the sitemap and a page list with page type, owner and status for every page. Gate: the page list is agreed and frozen. Changes after this go through a change request (template below).

This step is where most website projects are won or lost. A frozen page list turns "the website" into a known amount of work.

3. Content

Start content as early as possible, in parallel with wireframes, not after design.

  • An owner for every page, responsible for its content and for getting it approved.
  • Content before final design where possible. Designing around real content avoids rework and pages that don't fit their layout.
  • A content brief per page type: purpose, audience, key messages, sections, length guidance, calls to action.
  • Writers, editors and subject experts with dates. See content marketing project management for running the writing itself.
  • Search input: target topics and metadata for pages that should rank. See SEO project management.
  • Images and media: sourced, licensed and sized.

Gate: content for each page is approved by its approver before it's entered into the site.

4. Wireframes

What happens: page structure and user journeys for each page type, without visual design. Reviewing structure separately from looks keeps feedback focused.

Gate: wireframes for each page type approved by the project owner.

5. Design

What happens: visual design for each page type and the shared components (navigation, footer, forms, cards). Designed with real or near-final content.

Gate: designs approved, with a limited number of review rounds agreed in advance. See project management for creative teams for managing design reviews.

6. Build

What happens: templates and components built in the chosen platform, forms and integrations connected, a staging site where everyone can review.

Gate: every page type works on staging with sample content.

7. Content entry

What happens: approved content entered into the new site, page by page, with images, metadata and internal links.

Gate: every page on the page list is entered and marked ready on staging.

8. SEO, redirects and tracking

This is the step most often rushed, and the one that protects the site's existing traffic and measurement.

  • Redirect map: every old URL that changes or is removed points to the most relevant new URL. Start it as soon as the page list is agreed.
  • Metadata: titles and descriptions for every page.
  • Structure: headings, internal links, a sitemap file, and nothing important blocked from search engines on the live site.
  • Tracking: analytics, conversion events, tag manager, forms and their notifications, all tested on staging.
  • Integrations: CRM, email signup, chat or booking tools.

Gate: redirect map complete and tested on staging; a test conversion recorded.

9. QA

What happens: test everything before launch:

  • Pages on the main devices and browsers your visitors use.
  • Every form, button and link.
  • Page speed on key pages.
  • Accessibility: keyboard navigation, contrast, alt text, headings, form labels.
  • Spelling, broken images, placeholder text left behind.
  • Legal pages, cookie consent and privacy notices.

Record defects as tasks with a priority (blocks launch, fix soon, later).

Gate: no open defects that block launch.

10. Sign-off

What happens: the project owner and named approvers sign off the site on staging. Agree in advance what sign-off means (ready to launch, with the agreed list of known issues).

Gate: written sign-off.

11. Launch

  • Pick the time carefully: a quiet period, not a Friday afternoon or the day before a campaign.
  • A content freeze on the old site in the final days, so nothing is lost.
  • A launch checklist (template below), with an owner for each item.
  • A rollback plan: what happens if something important breaks.
  • Right after launch: check redirects, forms, tracking, key pages and search-engine access on the live site.

12. After launch

  • Monitor daily for the first week, then weekly: errors and broken links, redirects, form submissions, conversions, search performance in Google Search Console.
  • A fix list for issues found after launch, triaged like any defect.
  • Compare with the baseline at agreed points (for example after one and three months).
  • Hand over: who maintains which pages, how changes are requested, and the documentation for the platform.

Landing pages as an ongoing program

Many teams also need a steady flow of landing pages for campaigns and ads. Treat these as a recurring process rather than mini website projects:

  • A request with the campaign, audience, offer, call to action, deadline and tracking needs.
  • Templates for the common layouts, so most pages are content, not design.
  • A short pipeline: brief → copy → build from template → tracking → review → live.
  • A turnaround time agreed with the teams that request them.

See managing paid ads projects and marketing campaign project management for the campaigns these pages serve.

Scale it to your team size

Stage Solo marketer Small team (2–5) Growing team (6–20) Department (20+)
Discovery Analytics and a page list Plus a few stakeholder conversations Full discovery with interviews Discovery phase with research
Scope and sitemap Keep, short page list Keep, frozen page list Page list with owners and types Page list, governance, change control
Content You write it Owners per page Content workstream with writers and experts Content team, editorial governance
Wireframes Skip; use a template For key pages only Per page type Per page type, user-tested
Design Template or theme Light customisation Custom design per page type Design system
Build Theme or builder Freelancer or agency Agency or in-house developers Development team, staging, release process
SEO, redirects, tracking Keep, never skip Keep Keep, SEO owner Keep, SEO and analytics teams
QA Self-test on phone and laptop Checklist Structured QA QA team and accessibility audit
Sign-off You Project owner Owner plus approvers per page type Formal sign-off route
After launch Weekly checks for a month Fix list and checks Monitoring plan and baseline comparison Monitoring, reporting, governance

What breaks if you skip too much: no page list (scope never ends); no redirect map (search traffic drops); no tracking tests (no way to know if the new site works better).

What breaks if you keep too much: a small team running custom wireframes, design and a committee sign-off for a ten-page site. A good template, real content and a short checklist go a long way.

Roles and sign-offs

  • Project owner: accountable for goals, scope, budget and the final decision.
  • Project lead: runs the plan, the page list, reviews and the launch.
  • Page owners: responsible for each page's content and getting it approved.
  • Writers, editors and subject experts.
  • Designer and developer (in-house, freelance or agency).
  • SEO and analytics: redirects, metadata, tracking.
  • Approvers: brand, legal, product, leadership for specific page types.
  • IT or security: domains, hosting, access, integrations.
Decision Who decides
Goals, budget, launch date Project owner
The page list and changes to it Project owner, via change requests
Content on a page Page owner, with the named approver
Design Project owner, after agreed review rounds
Redirects and SEO setup SEO owner
Launch go/no-go Project owner

Set it up as work

Here's how to turn a website project into something everyone can see and run, in any project tool or a spreadsheet:

  • One project for the website, with groups for each phase or workstream: Discovery, Content, Design, Build, SEO and tracking, QA, Launch, After launch.
  • A task per page for content, with the page owner as assignee, the page type as a label, and a status that shows where its content is.
  • Milestones for the gates: brief approved, page list frozen, designs approved, content complete, QA complete, sign-off, launch.
  • Defects as tasks with a priority label.
  • Change requests as tasks too, so every scope change is visible and decided.
  • The agency or freelancers with access to the tasks they work on, and stakeholders able to review and comment.
  • Shared documents for the brief, the redirect map and the launch checklist, attached to the project.

Page content statuses:

Not started → Writing → Expert review → Approved → Entered → Ready on staging

The page list then answers the question every project owner asks ("how far along are we?") in one view.

Want this setup for your team? See how marketing teams run website projects in Pinrom →

What to track

Work health (weekly):

  • Pages by content status: how many are approved, entered and ready.
  • Open defects by priority.
  • Change requests raised and approved, and their effect on date and budget.
  • Milestones hit or missed.

Results (after launch, against the baseline):

  • Conversions on key pages: enquiries, sign-ups, sales.
  • Organic traffic and search performance for the pages that mattered most before launch.
  • Page speed and accessibility on key templates.
  • 404 errors and redirect issues, which should fall to near zero.

If you only have an hour a month after launch: conversions, organic traffic compared with the baseline, and the open fix list.

Cadence

When What Who
Weekly Project check: page list status, decisions needed, defects, risks Project lead, owner, agency
At each gate Review and approval Owner and named approvers
Final two weeks Short daily check-ins Project lead, developer, SEO
Launch week Daily monitoring Project lead, SEO, analytics
Monthly (first three months) Results vs baseline, fix list Project owner, lead

Handoffs

From / to What passes Artifact When
Stakeholders → project Goals and requirements Input to the website brief Discovery
Project → page owners What each page needs Page list, content brief per page type When the page list is frozen
Content → design Real content to design with Approved copy, images Before final design
SEO → project What must not break Baseline, redirect map, metadata From scope onwards
Design → build What to build Approved designs, component specs Before build
Build → content entry Templates to fill Staging site When templates work
Analytics → launch Working tracking Recorded test conversion Before sign-off
Project → paid, email, social New URLs and pages List of changed URLs, launch date Before launch
Project → maintainers Ownership after launch Handover document At launch

For how website work fits with the other kinds of marketing work, see how the types feed each other. For running a website project alongside campaigns and other work, see managing multiple marketing projects.

Templates

Website brief (with budget and expectations)

Project:                Owner:              Lead:
Kind: redesign / rebuild / migration / new site
Goals (and how each is measured):
Audiences:
Baseline (date): traffic ___ · conversions ___ · top pages ___
Fixed: date / budget / scope (pick what's fixed and what flexes)
Budget: design & dev ___ · content ___ · platform ___ · SEO ___ · QA ___ · contingency ___ · after launch ___
Constraints (platform, brand, legal, integrations):
Change requests approved by:
Agreed by: ___  Date: ___

Page list columns

Old URL | New URL | Page type | Keep / merge / rewrite / remove | Page owner | Approver | Content status | SEO priority

Redirect map columns

Old URL | New URL | Status (301) | Tested on staging | Tested live

Change request

Requested by:          Date:
What changes (pages, features):
Why:
Effect on date: ___   Effect on budget: ___
Decision: approved / rejected / later     By: ___

Launch checklist

[ ] Sign-off recorded; known-issues list agreed
[ ] Content freeze on the old site
[ ] Redirects live and spot-checked
[ ] Search engines allowed on the live site; sitemap submitted
[ ] Analytics and conversion tracking firing on live
[ ] Every form submits and notifies the right people
[ ] Key pages checked on mobile and desktop
[ ] Paid ads, emails and social links updated to new URLs
[ ] Rollback plan and contacts ready
[ ] Daily monitoring booked for launch week

After-launch checklist

[ ] Daily for week 1: errors, 404s, forms, conversions
[ ] Search Console: coverage and performance checked weekly
[ ] Fix list triaged twice a week
[ ] Baseline comparison at 1 and 3 months
[ ] Handover: page owners, change process, platform docs

Managing website projects for clients

Agencies and freelancers run the same process, with a few differences:

  • The page list is the contract. Agree it before design, and price changes against it.
  • Content responsibility in writing. Many agency website projects stall waiting for client content. Agree who writes, by when, and what happens to the timeline if it's late.
  • One client decision-maker, with named approvers per page type and turnaround times for each review round.
  • Clients see the plan, the page list status, staging and what's waiting on them; your internal discussion, estimates and margins stay internal.
  • Ownership of accounts: the client should own the domain, hosting, analytics and platform accounts.
  • Track hours by phase, so you can see where the project really went over and price the next one.
  • Agree what happens after launch: a fix period, then maintenance on a separate agreement.

Where it goes wrong

  • No frozen page list. Fix: agree the page list early; changes through change requests.
  • Design before content. Fix: start content in parallel with wireframes; design with real content.
  • Content owners who don't deliver. Fix: an owner and a date per page, and the page list status reviewed weekly.
  • Too many reviewers. Fix: one decision-maker and named approvers per page type.
  • Redirects left to launch week. Fix: start the redirect map as soon as the page list is agreed.
  • Tracking assumed, not tested. Fix: a recorded test conversion as a gate.
  • Launch on a Friday. Fix: pick a quiet weekday with people available to fix issues.
  • Nobody watching after launch. Fix: a monitoring plan and a fix list for the first weeks.

Tools

  • A website platform (CMS or builder) and a staging environment.
  • Design tools for wireframes and designs.
  • A place to plan and track the work: phases, the page list with owners and statuses, defects, change requests, reviews and the launch checklist, with access for the agency and stakeholders. A spreadsheet can hold the page list; a project tool keeps the tasks, owners, dates and comments together.
  • Analytics and Google Search Console for the baseline and monitoring.
  • A crawler for the content inventory, redirect checks and broken links.
  • Accessibility and speed checkers.

For a comparison of project tools for marketing teams, see the best project management tools for marketers.

Running website projects with a small team or for clients? See how to set it up in Pinrom →

FAQ

Frequently Asked Questions

Written by

Sathish Nagarajan - Founder at Pinrom

Sathish Nagarajan

Founder @ Pinrom

Sathish Nagarajan is the founder of Pinrom, a simple project management tool built for freelancers, solopreneurs, and small teams. He focuses on building lean, affordable software that helps teams stay organized without the complexity of enterprise tools.

Connect on LinkedIn